A complete renovation of a house in Amsterdam, with two new dormers. We removed load-bearing walls, built a new bathroom and kitchen, replaced all the windows and fitted a wooden staircase with built-in lighting.
What we did
After the demolition, including the removal of load-bearing walls for an open-plan layout, we built two dormers. A bathroom with a double washbasin and walk-in shower went in, and a new kitchen with the water and electrical connections. We rewired the electrics, with LED lighting and lowered ceilings, and fitted new radiators and a new central heating boiler. We replaced all the windows, and the wooden staircase got built-in lighting.
The finish
We levelled and plastered the walls and floors and painted them matt black. We give a 10-year guarantee on all our work.











