This bathroom in Amsterdam was almost twenty years old and had been through a lot over the years, including a leak. We renewed it completely, with a walk-in shower, a wall-hung toilet and electric underfloor heating.
The situation
After a leak it was time for a new bathroom. Then you do it properly: everything out, down to the floor and the walls, and a new watertight base.
What we did
We stripped out the old bathroom and took the waste away, laid electric underfloor heating and new floor and wall tiles, and fitted the washbasin, the walk-in shower, the wall-hung toilet and the vanity unit. A lowered ceiling with LED spotlights, plastering and painting finished it off.
The result
A comfortable, modern bathroom with warm feet, and a client who is set for years to come.









